25 Jul, 2025 by Cherry Pascual
Royal Cargo (Thailand) Co., Ltd. recently finalized the successful delivery of three (3) rotary dryer units, each weighing 91.56 metric tons, from Laem Chabang Port to Birla Carbon’s new industrial facility in Muang Rayong. The transportation route spanned 123 kilometers of uphill terrain, a task made more challenging by heavy rains, port congestion, and an unexpected road incident.
The rotary dryers, each measuring 24 x 4.56 x 4.70 meters, were discharged from a conventional breakbulk vessel at Laem Chabang in the early morning of July 17 and were received alongside berth between 8:00 AM and 2:00 PM on the same day. The movement was facilitated using three (3) 14-axle hydraulic trailers, designed specifically for managing immense loads.
READ: PT. Royal Cargo Logistics Indonesia Achieves Significant Milestones in First Half of 2025
Despite pre-planned coordination, the team faced critical operational challenges:
Royal Cargo Thailand’s project team remained agile and responsive throughout these challenges, collaborating closely with local authorities, port handlers, and crane operators to ensure zero damage and 100% safety compliance.
This successful execution demonstrates Royal Cargo Thailand’s ability to handle complex heavy transport operations under adverse conditions, coordinate projects, and address on-the-ground challenges in real-time.
Royal Cargo’s Project Transportation division continues to support key sectors such as power, industrial, and manufacturing. With well-established operations in the Philippines, Royal Cargo extends its specialized logistics solutions across Southeast Asia, maintaining a strong presence in 🇹🇭 THAILAND, 🇻🇳 VIETNAM, and 🇮🇩 INDONESIA. Delivering trust, one heavy load at a time.